![](https://www.kangaloader.com/wp-content/uploads/2022/07/Hero-Image-Overlay-25.jpg)
The Job – 50m3 of Dirt
Our machines worked hard at this backyard renovation. After ripping up the existing soil we then removed & loaded 50m3 of dirt into skip bins. We were called in to create a flat surface to lay turf and the Kanga powered through it and we were able to get it done pretty quick.
![Built with kanga JP Concrete Construction 50m3 of dirt](https://www.kangaloader.com/wp-content/uploads/2022/07/Built-With-Kanga-JP-Concrete-Construction-50m3-of-dirt.jpg)
The Results
![Built with kanga JP Concrete Construction 50m3 of dirt](https://www.kangaloader.com/wp-content/uploads/2022/07/Built-With-Kanga-JP-Concrete-Construction-50m3-of-dirt-2.jpg)
It’s a huge part of every job and often gets overlooked but we always appreciate an easy clean up.
Leave a Reply